Painter & decorator covering Northampton and surrounding areas

Hallway, Stairs and Landing Decorating in Boothville

From single-storey bungalow halls with a loft hatch overhead to three-floor stairwells in extended Boothville semis near Kettering Road.

  • Over 30 years experience
  • Free quotes & advice
  • Fully insured & trained
Staircase with oak barley-twist spindles and newel post, walls painted soft cream

Dean decorates hallways, stairs and landings across Boothville in Northampton's NN3 district, about 3 miles north-east of the town centre. Boothville has two very different kinds of hall, the flat single-storey hall of a bungalow and the tall stairwell of an extended semi, and each is planned and priced differently.

Two kinds of hall in one district

Boothville’s mix of bungalows and bay-fronted semis means the word “hallway” covers very different jobs here. A bungalow hall on a cul-de-sac like Woodside Avenue has no staircase at all. A semi on the Kettering Road edge, where 1930s double bay-fronted houses stand, may have been extended over three floors, giving two flights and a stairwell wall taller than any normal ladder reaches.

Hall typeMain challengeAccess we use
Bungalow hallLots of doors and a loft hatch in a small spaceHop-up platform and stepladder
Two-storey semiWall above the single flightStair ladder and boards
Extended three-floor semiTall stairwell, old and new plasterAdjustable stair platform and staging
Maisonette entranceNarrow private stair to a first-floor flatStair ladder, worked top-down

Bungalow halls and the loft hatch

Cloakroom WC seen through a white-painted architrave, cream walls and gloss woodwork finished
Cloakroom WC seen through a white-painted architrave, cream walls and gloss woodwork finished

A bungalow hall is quick to decorate, often a day or two for ceiling, walls and woodwork. The detail that catches people out is the loft hatch. Some Boothville bungalows have had loft rooms added, reached by a pull-down ladder from the hall ceiling, so the hatch frame and its surround get knocked and grubby every time it is used. We fill and paint the hatch lining and door along with the ceiling so it doesn’t stand out as the one tired patch. Because every room opens off the hall, we work in sections and keep a route through to the bathroom and kitchen.

Three-floor stairwells in extended semis

Where a semi has gone up a floor, the stairwell becomes the hardest part of the house to decorate. The upper flight often turns over the lower one, leaving a tall, narrow void. We set up a stair platform with staging boards across the drop rather than leaning ladders on treads, and plan the order so the ceiling and top wall are finished before anything below is touched. That order matters because drips and dust fall downwards, and it means the platform only has to be moved a few times. Landings in these houses can be small, so we agree in advance where the staging and paint will sit overnight. The extension also usually means the walls are part original plaster and part new. The two take paint differently: old surfaces may need cracks raked out and filled, while new plaster needs a diluted mist coat first. Treating both properly is what stops a visible line where the old house ends and the new floor begins. The access and finishing methods are set out in more detail on our main hallway, stairs and landing page.

Maisonettes with their own front door

Hallway with crystal chandelier and cream walls, new oak doors waiting to be hung
Hallway with crystal chandelier and cream walls, new oak doors waiting to be hung

The first-floor maisonettes at Yewtree Court have separate entrances, so the stair from the front door up to the flat belongs to that flat rather than to a shared block. That makes it simpler: there’s no communal area to coordinate, and the owner or tenant can choose the colour. If the property is leasehold, it is still worth checking the lease for any terms about the external door.

Choosing hard-wearing finishes

In a Boothville bungalow every room opens off the hall, so it is walked through all day, and in a three-floor semi the stair walls take knocks from everything carried up two flights. A scrubbable matt or eggshell on the walls and a durable satin on spindles, handrails and skirting keep the area easy to wipe down. Dean will look at the space, explain the access needed and give a written quote. See our Boothville page for the other work we cover in NN3.

Last updated by Dean, DH Painter & Decorator.

Landing wall painted warm cream around an oak door with white gloss architrave Cloakroom with cream walls, white coving and window frame painted, ornate mirror hung Hallway with chandelier and ornate mirrors, cream walls painted and oak doors propped ready Oak door opening onto a kitchen, with off-white walls and freshly glossed frame Oak cottage-style door varnished to a high-gloss sheen within a white painted frame Close-up of an oak door with a lacquered finish beside white gloss architrave

Hallways, stairs & landings in Boothville: your questions answered

Can't see your question? Call us on 07539 779 036 and we'll happily talk it through.

How long does it take to decorate a bungalow hall in Boothville?

Most single-storey bungalow halls take one to two days for ceiling, walls, doors and skirting, depending on how much filling the walls need and how many doors open off the hall. There's no stairwell to stage, so access is simple. We also include the loft hatch and its frame, which often get marked when a pull-down ladder is used.

Can you reach the top of a three-storey stairwell in an extended semi?

Yes. Tall stairwells in extended Boothville semis are handled with an adjustable stair platform and staging boards bridging the drop, not ladders resting on treads. The stairs stay usable at set times, and we tell you beforehand which periods the staircase will be blocked while the highest sections are worked on.

Why does the paint look different where my extension joins the old stairwell?

New plaster absorbs paint very differently from old painted plaster, so applying the same coats over both often leaves a visible patch or line. New plaster needs a mist coat to seal it, and older walls may need cracks filled and spot priming. Preparing each surface correctly before the finish coats is what evens the wall out.

Do I need permission to decorate the stairs to my Yewtree Court maisonette?

The maisonettes there have separate entrances, so the internal stair usually belongs to your flat and is yours to decorate. Painting the outside of the front door or communal parts is different: on a leasehold property it can need the freeholder's agreement, so check your lease before changing an external colour.

What customers say about Dean

Most of our work comes from recommendations and returning customers. These are real reviews from customers after the job was finished, in their own words.

More customer reviews

After completing my gates I was then assured Dean was more than competent to repaint the inside of my property from top to bottom. It’s a large 4 bedroom house and was done to a very high standard. Once again I would highly recommend him.

Customer review Gates, then a full four-bedroom interior

I contacted Dean to get the outside of the house painted; the house is all roughcast render. He has done a fantastic job; the house is looking brand new. The same he did for our garage, painted our bedrooms x2, did extra jobs for us like skirtings and door frames, and painted even our gates. I could not recommend him enough; he is attentive, smiling, always on time, and nothing too much; I am so happy with what Dean has done; he went above and beyond. I have recommended him to all my friends and family.

Read full review
Customer review Roughcast render, garage, bedrooms and gates

Dean did a great job for a good price i'd be very happy to recommend him always on time polite and friendly.

Customer review Painting and decorating

Start your project

Get a free painting and decorating quote

Tell us a little about the job and we'll arrange a visit to look at it properly. Quotes and advice are always free, with no obligation.

What happens next

  1. We get back to you to arrange a convenient time to visit.
  2. Free visit. We look at the job and talk through colours, finishes and any repairs.
  3. Written quote. A clear price covering preparation, materials and the finish we agreed.

Request a free quote

Please enter your name.

Please check your email address.

Please enter a valid phone number.

Prefer to talk? Call 07539 779 036.

Call 07539 779 036Call nowFree quote