Painter & decorator covering Northampton and surrounding areas

Hallway, stairs and landing decorating in Parklands

Decorating Parklands halls, from single-level bungalow corridors to stairwells rising through two flights to a room in the roof.

  • 2.5 miles north-east of the town centre
  • Over 30 years in the trade
  • Free written quotes
Hallway with crystal chandelier and cream walls, new oak doors waiting to be hung
Hallway with chandelier and ornate mirrors, cream walls painted and oak doors propped ready Oak door opening onto a kitchen, with off-white walls and freshly glossed frame Landing decorated in white with painted spindles and handrail Entrance hall in a warm neutral with white doors, skirting and painted staircase Landing wall in neutral emulsion with white doors and painted banister Narrow staircase with the walls and handrail painted white

About 47% of Parklands homes are bungalows, so for many owners on this NN3 estate the hallway is a single-level corridor with no stairs at all. The semis on Parklands Avenue and Crescent with rooms in the roof are the opposite: a stairwell that keeps going to a second floor. We decorate both, 2.5 miles from Northampton town centre.

When the hallway has no stairs

The Valuation Office counts 810 bungalows among the 1,740 homes in the two Census areas covering Parklands, so close to half the estate has its hall on one level. A bungalow hall is a narrow corridor with a door off it to every room, often a loft hatch in the ceiling, and nothing above head height that cannot be reached from a pair of low steps. That makes it quick, low-access work: no tower, no stair ladder, no boards across a stairwell. The time goes into the woodwork and cutting in round all those doors and frames, which in a two-bed bungalow means a door and frame for every room within a few metres of wall.

Because the hall is the route to every room, we usually leave it until the rest of the house is done. Doors are painted in an order that keeps the bathroom and one bedroom usable at all times.

Where the loft hatch is in the hall ceiling, its frame and lid are painted with everything else; a hatch that is used for storage is often the most marked piece of ceiling in the house and may need a stain-block first. If the hall has no window of its own and relies on borrowed light from open doors, a lighter, warmer wall colour and a white ceiling make the most of what little daylight reaches it.

Two flights up: stairwells in the roof-room semis

Landing wall painted warm cream around an oak door with white gloss architrave
Landing wall painted warm cream around an oak door with white gloss architrave

Energy certificates on Parklands Avenue and Parklands Crescent record rooms in the roof in several of the semis. Inside, that means the stairs carry on past the first-floor landing to a second floor. The wall beside the upper flight becomes the tallest wall in the house, and the ceiling above the top flight can be well out of reach from any landing.

To paint it safely we set up a combination ladder on the stairs, or a small platform bridging the treads, with boards levelled across the drop. Everything is roped or footed; nobody leans out from a stepladder balanced on a stair. Setting up takes time, so it makes sense to do the walls, ceiling, strings, spindles and handrail of both flights in one go rather than return for the woodwork later.

Keeping the way through open

Census 2021 found 30.4% of residents in the Parklands areas were 65 or over, nearly double the West Northamptonshire figure of 17.1%. For many households the stairs or hall cannot simply be closed off for a few days. We plan around that:

  • Bungalow halls are done in a day where the work allows, so the route between rooms is clear by evening.
  • On stairs, one side of the handrail or one flight is kept dry and usable while the other is painted.
  • Handrails are painted last thing, with a clear note on when they can be held again.
  • Walls get a scrubbable matt or eggshell, because halls take hands, bags and walking aids.

A clear contrast between the handrail, the walls and the stair nosings also helps anyone whose eyesight is not what it was. It is worth thinking about when choosing colours.

Parklands in brief
FactDetailSource
BungalowsAbout 810 of 1,740 dwellings, roughly 47% (Valuation Office)GOV.UK
Rooms in the roofRecorded on Parklands Avenue semisEPC register
Residents aged 65 or over30.4%, against 17.1% across West NorthamptonshireNomis (ONS)
Homes built 2021-2023About 140 (Valuation Office)GOV.UK

Three Parklands hallways compared

Cloakroom with cream walls, white coving and window frame painted, ornate mirror hung
Cloakroom with cream walls, white coving and window frame painted, ornate mirror hung
HomeHeightAccess we bringMain watch-point
BungalowSingle storeyLow stepsMany doors in a short corridor
Roof-room semiThree levelsStair ladder and platformTall upper stairwell and its ceiling
2021-23 house on Rockingham or Donnington CloseTwo storeysStair ladderSettlement cracks at the stair string and ceiling line

On the 2021-23 houses, the stairwell plaster is still young. In the first years cracks tend to open where the stair string meets the wall and where the wall meets the ceiling. We fill them with a flexible filler, mist-coat any bare plaster and then apply the colour.

Doors, skirtings and spindles are dealt with in more detail on our Parklands woodwork page. Our main hallway, stairs and landing decorating page covers the method, and the Parklands area page has the wider picture.

Sources

  1. Council Tax: stock of properties, 2025 (tables CTSOP 3.1 and 4.1), Valuation Office Agency (accessed 2026-11-16)
  2. Energy certificates, Parklands Avenue NN3 6DS, EPC register (accessed 2026-11-16)
  3. Energy certificates, Parklands Crescent NN3 6DT, EPC register (accessed 2026-11-16)
  4. Census 2021: age of residents, LSOAs E01027218 and E01027219 and West Northamptonshire, Nomis (ONS) (accessed 2026-11-16)
  5. Sold house prices, NN3 6FW (Rockingham Close), Rightmove (accessed 2026-11-16)

Last updated .

Parklands halls and stairs: what people ask

Something not covered here? Call Dean on 07539 779 036.

How do you reach the top of the stairwell in a Parklands roof-room semi?

With a combination ladder set up on the stairs, or a small platform bridging the treads, with boards levelled over the drop. The stairwell to a roof room is the tallest wall in the house, so we do the walls, ceiling and stair woodwork in one set-up rather than come back for parts of it later.

Can my bungalow hallway be decorated in one day?

Often, yes. A bungalow hall needs no tower or stair ladder, so the walls and ceiling can usually be done in a day. The doors and frames take longer and dry more slowly, so we paint them in an order that keeps the bathroom and one bedroom usable throughout.

How do you paint the stairwell of a roof-room semi on Parklands Avenue without blocking the way up?

The stairs carry on to a second floor, so we paint one side of the stairs or the handrail at a time and keep the other usable, do the handrail last thing in the day and tell you when it can be held again. With many Parklands residents over 65, we plan the order around how the household gets about.

Why has my new Donnington Close stairwell cracked?

New houses settle, and timber stairs and plaster dry out at different rates. In the first years, fine cracks along the stair string and at the wall-ceiling line are normal. We rake them out, fill them with a flexible filler, mist-coat any bare plaster and repaint. Large or widening cracks should be shown to the builder.

Why do the walls of a long bungalow hall mark so quickly?

A bungalow hall is the route to every room, so the walls take hands, shopping bags and walking aids all day. A scrubbable matt or a durable eggshell can be wiped without polishing up, and a tougher finish below dado height suits the busiest stretch.

Start your project

Get a free painting and decorating quote

Tell us a little about the job and we'll arrange a visit to look at it properly. Quotes and advice are always free, with no obligation.

What happens next

  1. We get back to you to arrange a convenient time to visit.
  2. Free visit. We look at the job and talk through colours, finishes and any repairs.
  3. Written quote. A clear price covering preparation, materials and the finish we agreed.

Request a free quote

Please enter your name.

Please check your email address.

Please enter a valid phone number.

Prefer to talk? Call 07539 779 036. How we use your details.

Call 07539 779 036Call nowFree quote