Painter & decorator covering Northampton and surrounding areas

Door and skirting painting in Camp Hill

Repainting the doors, skirtings, architraves and banisters of Camp Hill's 1973-92 houses, and the first repaint of Hill Fort Close joinery from 2021.

  • 1.8 miles south-west of the town centre
  • Over 30 years in the trade
  • Free written quotes
Sash window and sill painted white, seen from the scaffold

We paint internal doors, skirtings, architraves and stair woodwork across Camp Hill, NN4, about 1.8 miles south-west of Northampton town centre. Almost all the estate was built between 1973 and 1992, so most woodwork carries decades of gloss and needs proper preparation, not just another coat.

Decades of gloss on 1973-92 joinery

The Valuation Office Agency dates 640 of Camp Hill’s 720 homes to 1973-92: 260 to 1973-82 and 380 to 1983-92. Unless doors and skirtings have been replaced, the softwood joinery in those houses is between 35 and 50 years old, and it has been painted every few years since. By now a typical skirting carries several layers of paint, often oil gloss, with runs and drips from earlier coats, chipped edges where the vacuum cleaner hits it, and filler that has shrunk back in old nail holes.

Putting another coat over that only makes the edges rounder. Proper preparation on woodwork of this age means:

  • Washing down with sugar soap to remove grease, especially on kitchen doors and frames.
  • Sanding out runs and sags and feathering chipped edges so they do not show through.
  • Scraping back any paint that has lost adhesion, which is common on the bottoms of doors and on skirtings near radiators.
  • Filling dents and old nail holes, and running a fine bead of decorator’s caulk where skirting meets wall.
  • Keying the whole surface so the new paint grips the old.

Where the build-up has got so thick that doors no longer close or the detail on an architrave has disappeared, stripping back to bare wood is an option, and we say when it is worth the time. Our main doors, skirtings and woodwork page describes the full process. For what affects the price of woodwork-only jobs, see our Northampton cost guide.

Why white gloss yellows in Camp Hill’s shaded rooms

Side of an ironstone house with repainted white sash and arched windows
Side of an ironstone house with repainted white sash and arched windows

Rooms on the north or north-west side of the hill get little direct daylight. Oil-based gloss and satin yellow with age, and they yellow faster in low light: a white door in a dark north-facing hall or bedroom can turn cream within a few years. That is why many owners switch to a water-based satin or eggshell, which stays white. The switch needs care, though. Water-based paint will not grip shiny old oil gloss on its own, so after keying we use an adhesion primer designed to go over it before the top coats.

JoineryWhere in Camp HillWhat it usually needs
Original 1973-82 softwoodEarliest streets of the estateHeavy build-up; sanding, filling, possibly stripping on doors that stick
Original 1983-92 softwoodHarksome Hill (dated 1983-90) and much of the restKeying and filling; adhesion primer if moving from oil to water-based
2021-22 new-build joineryHill Fort CloseLight sand of the builder’s coat; caulk the shrinkage gaps; two finish coats
Replacement doorsAnywhereCheck for factory finish; some need a specific primer

Hill Fort Close: the first repaint

The 70 or so homes at Hill Fort Close were built in 2021-22, and their joinery is now due its first proper repaint. Builders usually finish skirtings and architraves in a quick coat over the factory primer, and after a few years of a family living in the house it shows: scuffed skirtings, chipped door edges and gaps opening where the timber has shrunk away from the wall as the house dried out. We sand lightly, caulk the shrinkage gaps, and apply two finish coats in the sheen you choose. It is a much quicker job than on the older houses, because there are no old layers to deal with.

Local facts: Camp Hill
FactDetailSource
Built 1973-82260 homes (VOA, March 2026)GOV.UK
Built 1983-92380 homes (VOA, March 2026)GOV.UK
Built 2021-22About 70 homes at Hill Fort CloseEPC register
Private renting22.3% of households (Census 2021)Nomis (ONS)

Woodwork in rented homes

Sash window painted pale grey in the morning sun
Sash window painted pale grey in the morning sun

Census 2021 found 22.3% of Camp Hill households renting privately and 18.8% in social housing. In let houses, woodwork takes more knocks than walls and gets cleaned more often, so a hard-wearing satin that wipes clean is the better finish, and quick-drying water-based paint lets a house be handed back sooner. In the leasehold flats in some of the Squares, the front door of each flat onto the shared stair is normally a fire door. It can be painted, but the intumescent strips and smoke seals in the frame or door edge must not be painted over, the closer must stay fitted and working, and the door must still shut fully into its frame afterwards. We mask the seals, keep the paint film thin on the edges, and check the door closes properly before we leave. Painting stair spindles and banisters with the rest of the hall is covered on our Camp Hill hallways and stairs page, and the Camp Hill area page gives the wider picture.

Sources

  1. Council Tax: stock of properties 2026, table CTSOP4.1 (build period by LSOA), Valuation Office Agency (accessed 2026-11-16)
  2. New-build energy certificate, Hill Fort Close (2021), EPC register (GOV.UK) (accessed 2026-11-16)
  3. Census 2021 TS054 tenure, LSOA E01027252 (West Northamptonshire 036D), Nomis (ONS) (accessed 2026-11-16)
  4. Energy certificates by postcode, Harksome Hill (NN4 9YF), EPC register (GOV.UK) (accessed 2026-11-16)
  5. EU-DEM 25 m elevation points across Camp Hill, Open Topo Data (accessed 2026-11-16)

Last updated .

Woodwork in Camp Hill homes: questions

Anything else you want to ask? Ring 07539 779 036.

Should I switch from oil gloss to water-based satin on my 1980s Camp Hill doors?

Many people do, especially in the north-facing rooms common on the estate, where oil gloss yellows fastest. Water-based satin stays white and dries quickly with little smell. It must go over a keyed surface and an adhesion primer, because it will not grip old oil gloss on its own. Done that way, it lasts as well as the gloss it replaces.

Do you strip all the old paint off original 1970s and 1980s skirtings?

Not usually. Most original Camp Hill skirtings only need runs sanded out, chips feathered, dents filled and the surface keyed. Stripping to bare wood is worth it where the build-up has hidden the moulding or doors no longer close, and we point those out at the quote rather than stripping everything by default.

Can the builder's paint on my Hill Fort Close skirtings be painted over?

Yes. Hill Fort Close joinery from 2021-22 has only a builder's coat over the primer, so it needs a light sand, a clean, caulk in any gaps where the timber has shrunk from the wall, and two finish coats. There are no old layers to remove, so it is a much quicker job than on the estate's older houses.

How long does it take to paint all the doors and skirtings in a Mallard Close house?

Houses on Mallard Close are about 40-55 m², so there are only a handful of doors and short runs of skirting. With preparation and two coats, the woodwork of the whole house is usually two to three days' work. Doors are painted in place with the handles removed, and each one is left open to dry.

Lead-roofed bay window and the sash above repainted pale grey Small casement window and sill painted pale grey in red brick Window sill freshly painted brilliant white Oak cottage-style door varnished to a high-gloss sheen within a white painted frame Oak door opening onto a kitchen, with off-white walls and freshly glossed frame Close-up of an oak door with a lacquered finish beside white gloss architrave

Start your project

Get a free painting and decorating quote

Tell us a little about the job and we'll arrange a visit to look at it properly. Quotes and advice are always free, with no obligation.

What happens next

  1. We get back to you to arrange a convenient time to visit.
  2. Free visit. We look at the job and talk through colours, finishes and any repairs.
  3. Written quote. A clear price covering preparation, materials and the finish we agreed.

Request a free quote

Please enter your name.

Please check your email address.

Please enter a valid phone number.

Prefer to talk? Call 07539 779 036. How we use your details.

Call 07539 779 036Call nowFree quote