We paint new plaster and plasterboard across Camp Hill, NN4, about 1.8 miles south-west of Northampton town centre. The commonest jobs here are the first full redecoration of the 2021-22 Hill Fort Close homes, repairs and new partitions in the timber-frame Squares, and extensions or loft rooms on the compact 1980s semis.
Hill Fort Close, five years on

Hill Fort Close is the newest part of Camp Hill: about 70 homes built in 2021-22 on the eastern side of the estate nearest the hillfort, with new-build energy certificates dated July and September 2021. The houses on those certificates are two-bedroom semis of about 84 m², and some have been sold as shared ownership. Five years in, they are reaching the point where owners want the builder’s finish replaced with something of their own, and that first redecoration has its own problems.
- The builder’s emulsion. New-builds are usually handed over in a thin contract matt that marks easily and does not wipe clean. It is often powdery, so we wash it down and test it with tape before deciding whether it needs a sealer.
- Settlement cracks. As a new house dries out and its timbers shrink, fine cracks open at the junction of walls and ceilings, around door frames and along board joints. By year five most have appeared. They are raked out, filled with a flexible filler and sealed so they stay closed under the new paint.
- Nail and screw pops. Fixings in plasterboard can push through the surface as the frame settles. Each one is knocked back or re-fixed, filled and spot-primed.
- Bare patches. Any area patched or re-skimmed since handover is treated as new plaster and gets a mist coat first.
| Fact | Detail | Source |
|---|---|---|
| Hill Fort Close | New-build certificates dated July and September 2021; semis about 84 m² | EPC register |
| Homes built 2021-22 | 70 (VOA, March 2026) | GOV.UK |
| Hill Fort Close fabric | Walls rated 0.23 W/m²K with air-permeability testing on the 2021 new-build certificates | EPC register |
| Shared-ownership resales | Hill Fort Close homes marketed at 65% shares | Rightmove |
Repairs and new partitions in the timber-frame Squares
In the eleven Squares off Dayrell Road, 53 of 66 sampled energy certificates record timber-frame walls. When a wall in one of those houses is altered, a doorway moved or a new stud partition put in to make an extra room, the new surface is plasterboard, either finished with a skim coat of plaster or taped and jointed. The two need different first coats. A fresh skim is porous and goes on with a diluted mist coat once it has dried to an even pale colour. Taped-and-jointed board has two surfaces, the paper face of the board and the jointing compound, which absorb paint at different rates, so it needs a drywall sealer or primer first, or the joints show through as a dull stripe. Our guide on painting new plaster with a mist coat covers the skim side in detail.
| New surface | Where it turns up in Camp Hill | First coat |
|---|---|---|
| Fresh skim on block or board | Extensions, re-skimmed ceilings, patched walls | Mist coat of thinned emulsion once fully dry |
| Taped-and-jointed plasterboard | New partitions in the timber-frame Squares; loft rooms | Drywall sealer or primer, then emulsion |
| Builder’s matt over new plaster | Hill Fort Close (2021-22) | Wash, test, seal if chalky, then two coats |
| Skim over an old textured ceiling | Original 1973-92 houses | Mist coat once dry |
Extensions and loft rooms on the 1980s semis

The semis on Merryhill, Cullahill Court and Hernhill Court are about 66-70 m², and on Harksome Hill 60-74 m², so a single-storey extension or a loft room adds a large share to the house. Ceilings in houses of the 1970s and 1980s were often given a textured finish when they were built, and when one is skimmed over during building work, that ceiling is new plaster too. Any textured coating should be tested for asbestos before it is sanded or scraped; skimming over it leaves it sealed in place.
New plaster has to dry before it is painted, and in Camp Hill that can take longer than the usual rule of thumb. An extension on the north or north-west side of a house gets little sun on its walls. In winter a skimmed wall in an unheated extension can stay damp for weeks. We check that the plaster has gone an even, pale colour all over, with no darker patches at corners or around sockets, before the mist coat goes on. Painting it sooner traps moisture and the paint fails. The rest of the process is on our main new plaster and extensions page.
Working with your builder
On an extension, decorating is the last trade in. We like to see the room before the plasterer leaves, to agree when it will be dry enough and to flag anything that will show under paint, such as a poor joint at a window reveal. Woodwork in a new extension, the skirtings and architraves, is usually primed bare timber that needs knotting, priming and two coats; our Camp Hill woodwork page covers older joinery elsewhere in the house. For the wider picture of the estate see the Camp Hill area page.
Sources
- New-build energy certificate, Hill Fort Close (2021), EPC register (GOV.UK) (accessed 2026-11-16)
- Council Tax: stock of properties 2026, table CTSOP4.1 (build period by LSOA), Valuation Office Agency (accessed 2026-11-16)
- Energy certificates by postcode, the Squares off Dayrell Road (NN4 9RE), EPC register (GOV.UK) (accessed 2026-11-16)
- Energy certificates by postcode, Harksome Hill (NN4 9YF), EPC register (GOV.UK) (accessed 2026-11-16)
- Energy certificates by postcode, Merryhill (NN4 9YH), EPC register (GOV.UK) (accessed 2026-11-16)
- Shared-ownership resale, Hill Fort Close, Rightmove (accessed 2026-11-16)
- EU-DEM 25 m elevation points across Camp Hill, Open Topo Data (accessed 2026-11-16)
Last updated .







