DH Painter & Decorator takes on commercial painting in Guilsborough, NN6, about 9.3 miles north-west of Northampton town centre. The village's premises range from a 1950s school block faced in stone from the demolished Guilsborough Hall to clinical rooms, nurseries and offices in a converted stable block, and Dean plans each around when it is open.
| Fact | Detail | Source |
|---|---|---|
| Guilsborough Academy pupils | About 1,200 | Ofsted |
| Academy main block | 1955-59, upper storey faced in stone from the demolished Guilsborough Hall | Northamptonshire HER |
| Academy extension | 1967-8, curtain walling and brown concrete panels | Northamptonshire HER |
| GP surgery and pharmacy | West Haddon Road, on that site since 2003 | guilsborough-pc.gov.uk |
| York Studios | Five office units in a converted stable block on Cold Ashby Road | boxpodcommercialproperty.co.uk |
| Day nurseries | Two: School House Day Care (The Green) and The Baby Barn at York Studios | Food Standards Agency |
Guilsborough Academy: Hall stone, curtain walls and the summer holiday
The largest premises in the parish is Guilsborough Academy on West Haddon Road, a secondary school of about 1,200 pupils. Its buildings span several decades and take paint differently. According to the Northamptonshire Historic Environment Record, the main block was built in 1955-59 by the County Architect’s Department, with its upper storey faced in stone from the demolished Guilsborough Hall. A 1967-8 extension by John Goff has curtain walling and brown concrete panels, and a sixth-form centre followed in 2004.
| Part of the site | What it is built of | What that means for painting |
|---|---|---|
| 1955-59 main block | Upper storey faced in reused Hall stone | Stone left bare; the work is windows, doors, eaves and interiors |
| 1967-8 extension | Curtain walling and brown concrete panels | Metal framing needs degreasing, keying and a primer made for metal; uncoated concrete is left as it is |
| Interiors of the older blocks | Decades of paint on plaster, timber and steel | Old layers checked for lead before sanding; tired gloss keyed and primed before new paint |
A school of that size cannot be decorated around pupils, so the realistic window is the school holidays, the summer break above all. Corridors and halls usually go first because they take longest, with classrooms after. The 2004 sixth-form centre is a different case again: newer plaster and plasterboard that take a standard trade system, where the main work is repairing knocks and keeping colours consistent with the rest of the site. On a campus with blocks from three different periods, we keep a written record of every paint used, by building and room, so touch-ups in later holidays match. Access, keys and site rules are agreed with the school’s site staff before we start.
Clinical rooms and nurseries: what the paint has to do
The Surgery on West Haddon Road, with its pharmacy, moved to that site in 2003. Treatment and consulting rooms are wiped down with disinfectant every day, so they need a hard-wearing, scrubbable finish, and we keep the colour references on file for later touch-ups. Work is booked around the practice’s opening times so nobody is walking past wet paint.
Guilsborough has two day nurseries: School House Day Care on The Green and The Baby Barn / The Little Paddocks at York Studios on Cold Ashby Road. Both would be planned around their opening days, with low-odour paints so the rooms are usable again quickly.
Offices in converted farm buildings on Cold Ashby Road

York Studios is five office units created from an old stable block, with parking, and the Neighbourhood Plan also lists barn-to-office conversions at York Barns and Ashby Farm. Units like these change hands between tenants, and the redecoration in between is usually quick: walls back to a clean neutral, scuffs out of the woodwork, doors and frames refreshed. In converted agricultural buildings the walls can be a mix of new plaster, exposed brick or stone and old timber, each needing a different primer. Our page on new plaster and conversions in Guilsborough covers the plastering side.
The rest of the village’s working buildings

Guilsborough CE Primary School on the High Street is, like the Academy, a job for the school holidays. The village hall is another candidate: the Neighbourhood Plan lists upgrading it as a priority, including internal improvements and replacing its dilapidated stage (para 220). The plan also records the fire station, the playing field pavilion and three small barns on the Green, dated 1826, 1870 and 1897: the Old Coal Barn, the Old Fire Engine House and the village bier store. Old timber doors on buildings like those take a traditional oil paint rather than a modern plastic coating. The shop and Post Office, and the closed Witch & Sow pub, are on our Guilsborough shopfront page. The main commercial painting page explains how we plan work around a business that stays open, and the village as a whole is on the Guilsborough page.
Commercial painting in Guilsborough: common questions
Can't see your question? Call us on 07539 779 036 and we'll happily talk it through.
Can classrooms at Guilsborough Academy be repainted during the summer holidays?
That is the usual time for school work, because the buildings are empty and paint has weeks to cure before pupils return. On a site of around 1,200 pupils with blocks from the 1950s, 1960s and 2000s, the job is planned block by block. We agree access, keys and site rules with the school before starting.
Do the 1960s parts of Guilsborough Academy need special primers?
The 1967-8 extension has curtain walling and concrete panels, and buildings of that age often have painted steel and old gloss on timber. Metal needs degreasing and a primer made for it, and old gloss has to be keyed so new paint grips. Paint layers from that era should be tested for lead before anyone sands them.
Can York Studios office units be redecorated between tenants?
Yes. A changeover in a small office unit is usually a short job: walls back to a neutral, woodwork touched up and doors refreshed. York Studios is a converted stable block, so some walls may be exposed brick, stone or old timber rather than plaster, and those need their own primers. The quote is free after a visit.
Will you quote for redecorating the village hall?
Yes. The Neighbourhood Plan lists upgrading the hall as a priority, including internal improvements and replacing its dilapidated stage (para 220), so any quote would start with a look at the plaster, woodwork and old paint layers. Halls are often booked by several groups, so we plan the work around the bookings calendar and give a written breakdown that a committee can approve.
Sources
- Guilsborough Academy inspection reports, Ofsted (accessed 2026-11-16)
- Guilsborough School (Guilsborough Academy), Northamptonshire HER (accessed 2026-11-16)
- Guilsborough Academy, Wikipedia (accessed 2026-11-16)
- Guilsborough Neighbourhood Development Plan, reviewed version May 2022, Guilsborough Parish Council (accessed 2026-11-16)
- The Surgery, Guilsborough: pharmacy listing, NPN (accessed 2026-11-16)
- Food hygiene register: Guilsborough establishments, Food Standards Agency (accessed 2026-11-16)
- York Studios, Cold Ashby Road: office unit listing, Boxpod Commercial Property (accessed 2026-11-16)
- Guilsborough Hall (site), Northamptonshire HER (accessed 2026-11-16)
Last updated .







