Dean paints metal gates, railings and bin-store enclosures in St David's, on the east side of Kingsthorpe about 1.9 miles north of Northampton town centre. Schools, flat blocks and community buildings hold most of the metalwork, and every job starts with a free look at the rust.
Four schools and their perimeter fencing
The longest runs of metal fencing in St David’s are around its schools. Four are in or at the edge of the district:
| School | Road |
|---|---|
| All Saints CEVA Primary School | Boughton Green Road (NN2 7AS) |
| Kingsthorpe Grove Primary School, with Kingsthorpe Children’s Centre | St David’s Road |
| Green Oaks Primary Academy | Whiston Road |
| Purple Oaks Academy | Whiston Road |
Kingsthorpe College, on Boughton Green Road at the northern edge of the district, adds a fifth large site.
School fencing is usually galvanised or painted mild steel, and rust starts where the coating is broken: on the bottom rail where mowers and strimmers catch it, around the hinge pins and latches of gates, and at the tops of uprights where water sits. The work is to wire-brush or abrade every rust spot back to bright metal, prime the bare steel with a rust-inhibiting primer and finish in a tough metal paint. Galvanised steel that has never been painted needs a mordant wash or a primer made for zinc, or the paint will lift off in sheets.
| Fact | Detail | Source |
|---|---|---|
| All Saints CEVA Primary School | Boughton Green Road, NN2 7AS | Food Standards Agency |
| Kingsthorpe Grove Primary School | St David’s Road, beside Kingsthorpe Children’s Centre | OpenStreetMap |
| Green Oaks and Purple Oaks academies | Whiston Road | OpenStreetMap |
| Scholars Green Student Village | Retained University of Northampton halls on the former Park Campus | parkcampusmemories.org.uk |
Why the school holidays set the dates

Railings around a school cannot be wet-painted while children are going in and out. That puts school jobs in the holidays, and the summer break gives the longest run of dry weather. Schools tend to plan this kind of maintenance well ahead, so the right time to ask for a quote is the spring before. We put up signs and barriers, keep entrances usable for any staff on site, and work along the fence in sections so the boundary stays secure.
A school railing job usually runs in the same order:
- A walk round the whole perimeter with the site manager, noting bad sections, loose posts and gates that drag.
- Wire-brushing and spot-priming every rust patch first, so the worst areas get two primer coats by the end.
- A full coat of metal paint over the whole run, in the school’s existing colour unless it wants a change.
- Hinges, latches and locks kept free of paint and checked for movement before we leave.
Bin stores and boundaries at the flat blocks
The 1970s blocks on Newnham Road and Drayton Walk have metal bin-store gates, boundary railings and handrails at their entrances. These get knocked by wheelie bins and take rain from every side. For a social landlord the job is usually part of a maintenance cycle: treat the rust, repaint in the landlord’s colour, and keep the bin stores usable while the paint dries, usually by doing one gate at a time.
Church, surgery, student village and house gates

Along Eastern Avenue South, the frontages of St David’s Church and Kingsthorpe Medical Centre face the main road, and to the north the Scholars Green Student Village keeps the boundary of the former university halls, which is easiest to work on during the summer vacation. At home, the metalwork tends to be a front gate, a short run of railings or a handrail beside the front steps. Small items like these can often be lifted off their hinges and painted on trestles, which gives a better finish on the undersides.
Older metalwork on the 1930s and 1950s houses is often mild steel that has been painted many times. Where layers are flaking, we take them back to a sound edge rather than painting over loose paint, which would only lift again. If the paint on a pre-war gate is old enough to contain lead, it is rubbed down wet, never burned off, and the dust is collected. A gate that has rusted through at the joints may need a welder before painting, and Dean will say so at the visit rather than paint over it.
The rust treatment is explained in detail on the main metal gate and railing painting page. For timber gates and fences see the St David’s fence staining page, and for indoor work in schools and halls our St David’s commercial page. The best time for exterior painting guide covers the weather limits, and the St David’s area page lists the rest.
Sources
- Food hygiene rating register (FHRS API), Food Standards Agency (accessed 2026-11-16)
- OpenStreetMap features around St David's (Overpass API), OpenStreetMap (accessed 2026-11-16)
- Park Campus Memories, Park Campus Memories (accessed 2026-11-16)
- About us - St David's Church, Kingsthorpe, A Church Near You (accessed 2026-11-16)
- Newnham Road, NN2 7: property types, ages and tenure, Streetlist (accessed 2026-11-16)
- Drayton Walk, NN2 7: property types, ages and tenure, Streetlist (accessed 2026-11-16)
Last updated .







